Construction and Extraction · SOC 47-2053
Terrazzo Workers and Finishers
Apply a mixture of cement, sand, pigment, or marble chips to floors, stairways, and cabinet fixtures to fashion durable and decorative surfaces.
Will AI replace this job?
The data cannot say, and anyone who gives you a percentage for “replaced” is guessing. What it does show is a gap between three things, for the 26 tasks O*NET lists for this occupation:
Could an LLM do it?
0%
of tasks: an LLM alone could do the task or cut its time by half. Human raters say 0%, GPT-4 says 0%.
Counting tasks that need extra software around the model: 0%–4%.
Is it happening?
0 of 26 tasks
show measurable use in Claude conversations (Anthropic Economic Index). Anthropic’s occupation score, which counts only tasks that were also rated feasible, is 0%. Observed is a subset of “could” by construction.
Claude only, mostly US users, sampled periods in 2025. Not all AI use, and not employment.
What is left?
25 of 26 tasks
were rated “no LLM speed-up” by every rater (so, by Anthropic’s method, they cannot show up as observed use either). That is the part of the job these studies see no sign of AI touching.
It does not mean those tasks are safe. It means these methods found nothing there.
Task by task
Sorted with the tasks seen in use first. The three coloured squares are the three raters, in this order: human raters, GPT-4, GPT-4 with an alternative rubric. “Usage score” is Anthropic’s published task_penetration value; 0 means none seen.
| Task (O*NET 31.0) | Could an LLM? | Claude usage score |
|---|---|---|
| Modify mixing, grouting, grinding, or cleaning procedures, according to type of installation or material used. | 1 of 3 raters | none seen |
| Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer. | no rater | none seen |
| Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines. | no rater | none seen |
| Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks. | no rater | none seen |
| Blend marble chip mixtures, place into panels, and push a roller over the surface to embed the chips. | no rater | none seen |
| Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats. | no rater | none seen |
| Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder. | no rater | none seen |
| Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer. | no rater | none seen |
| Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation. | no rater | none seen |
| Fill slight grinding depressions with matching grout material and hand-trowel for a smooth, uniform surface. | no rater | none seen |
| Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment. | no rater | none seen |
| Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish. | no rater | none seen |
| Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel. | no rater | none seen |
| Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine. | no rater | none seen |
| Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools. | no rater | none seen |
| Mold expansion joints and edges, using edging tools, jointers, or straightedges. | no rater | none seen |
| Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow. | no rater | none seen |
| Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven. | no rater | none seen |
| Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill. (supplemental) | no rater | none seen |
| Precast terrazzo blocks in wooden forms. (supplemental) | no rater | none seen |
| Wet concrete surface and rub with stone to smooth surface and obtain specified finish. (supplemental) | no rater | none seen |
| Build wooden molds, clamping molds around areas to be repaired, or setting up frames to the proper depth and alignment. (supplemental) | no rater | none seen |
| Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base. (supplemental) | no rater | none seen |
| Produce rough concrete surface, using broom. (supplemental) | no rater | none seen |
| Remove frames when the foundation is dry. (supplemental) | no rater | none seen |
| Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms. (supplemental) | no rater | none seen |
Try it with your own task list
Sources: task list from O*NET® Database (U.S. Department of Labor, CC BY 4.0; modified by noworkleft.com); “could” labels from Eloundou et al., GPTs are GPTs (OpenAI/University of Pennsylvania, MIT licence, labels from early-2023 models); “seen in use” from the Anthropic Economic Index (Claude usage only, CC BY). Dates, versions and limits.
Other jobs in Construction and Extraction
- Structural Iron and Steel Workers (5% observed)
- Construction and Building Inspectors (5% observed)
- Insulation Workers, Mechanical (4% observed)
- First-Line Supervisors of Construction Trades and Extraction Workers (3% observed)
- Construction Laborers (3% observed)
- Roofers (2% observed)
- Plumbers, Pipefitters, and Steamfitters (1% observed)
- Boilermakers (0% observed)
Data built 2026-11-06. O*NET 31.0. Task match rates: 99.4% with the OpenAI/Penn labels, 99.2% with Anthropic usage.